Twenty-eight years, project by project
Every row below is a program DASCOH Foundation has carried from agreement to the ground — where it worked, who backed it, and what it set out to change. Search it, filter it, or open a row for the full objective.
| # | Project | Upazila / District | Timeframe | Status | Total Budget | Funding Agency |
|---|---|---|---|---|---|---|
| 01 | WatSan Partnership (WPP) Project: Community Management Component. | 35 unions in 10 Upazillas in Rajshahi and Chapai Nawabgonj districts. | February 1998 to March 2004 | Completed | BDT 79,087,322 | Swiss Agency for Development and Cooperation (SDC) |
|
Goal / Objective
To improve the rural water and sanitation situation in low water table and/or arsenic affected areas in Bangladesh |
||||||
| 02 | Post Flood Rehabilitation Project (PFRP) | 5 Upazila (Shibganj, Moharajpur, Gobratola, Baliadanga of Chapainawabganj district and Charghat Upazila of Rajshahi district | 1999 to 2000 | Completed | 35,96,600 | Swiss Development and Cooperation (SDC) |
|
Goal / Objective
It was sub-project of WatSan Partnership Project and the main objective of this project was to rehabilitate the Water and Sanitary Infrastructures those were severely affected by the devastating flood in 1998. |
||||||
| 03 | Sustainable Solutions for the Delivery of Safe Drinking Water (SDSD) Project | 6 unions in Paba, Mohonpur and Bagmara Upazila in Rajshahi and 11 Unions in Shibganj and Chainawabganj Sadar | April 2003 to December 2012 | Completed | BDT 456,830,998 | Swiss Agency for Development and Cooperation (SDC) |
|
Goal / Objective
Strengthen local participatory governance at the UP level to improve sustainable and equitable delivery of WatSan services. |
||||||
| 04 | Sustainable Solutions for the Delivery of Safe Drinking Water (SDSD) Project | 25 UPs of Derai, Sulla, Jamalganj and Tahirpur Upazila in Sunamganj district | January 2013 to December 2015 | Completed | BDT 210,000,000 | Swiss Agency for Development and Cooperation (SDC) |
|
Goal / Objective
Contribute to equitable and sustainable access to community managed water and sanitation services through improved governance in Rajshahi, Chapai Nawabganj and Sunamganj districts. |
||||||
| 05 | Public HealthProject Rajshahi (PHPR) | 9 Unions and 2 Paurashavas of Godagari Upazila, Rajshahi District. | January 2009 to December 2012 | Completed | BDT 131,852,646 | Swiss Red Cross (SRC) |
|
Goal / Objective
Main objective of the project was sustainable improvement of health status of the population. |
||||||
| 06 | Public Health Improvement Initiative in Rajshahi (PHIIR) Phase I & II | 233 Community Clinics in 71 Ups in 9 Upazila of Rajshahi district in Phase I and 262 Community Clinics, 22 Family Welfare Centre and 5 Upazila health complex in Phase II | January 2013 to September 2019 | Completed | BDT 178,885,239 | Swiss Red Cross (SRC) |
|
Goal / Objective
Population of rural area of Rajshahi district has access to improved primary/essential health care services through well-functioning Community Clinics |
||||||
| 07 | Public Health Improvement Initiative in Rajshahi Phase-III | 110 Community Clinic, 42 Family Welfare Centre and Union Sub Centre, 5 Upazila Health Complex | October 2019 to September 2022 | Completed | BDT 89,174,657 | Swiss Red Cross (SRC) |
|
Goal / Objective
Contribute to an improved health status of the target population with special focus on maternal, neonatal and child health through health system strengthening to cover PHC system in Rajshahi division. |
||||||
| 08 | Water Sanitation and Hygiene for Vulnerable Barind Tract Communities (WASH in Barind Tract) | 12 unions in Porsha and Sapahar Upazila in Naogaon district | January 2013 to June 2019 | Completed | BDT 266,473,779 | Swiss Red Cross (SRC) |
|
Goal / Objective
Contribute to improved health and well-being of the people in the project area by increasing access to safe water, sanitation and hygiene promotion. |
||||||
| 09 | Integrated Water Resource Management (IWRM) Project (Phase-I) | 35 Unions and 4 Pourashavas in 6 Upazila of Rajshahi and Chapai Nawabganj districts | September 2014 to June 2018 | Completed | BDT 303,104,050 | Implemented by DASCOH-SRC consortium in collaboration with ministry of water resources financed by SDC |
|
Goal / Objective
Increase availability of water in Barind area through sustainable, effective, inclusive management and use of water resources |
||||||
| 10 | Integrated Water Resource Management (IWRM) Project (Phase-II) | 39 Unions and 3 Pourashava in 8 Upazila of Rajshahi, Chapai Nawabganj and Naogaon districts | 01 July 2018 to 31 December 2023 | Completed | BDT 468,112,684 | Jointly implemented by DASCOH-SRC consortium in collaboration with ministry of water resources financed by SDC |
|
Goal / Objective
Increase availability of water for disadvantaged people in the Barind areas through sustainable, effective, inclusive management and use of water resources, thereby improving local livelihood systems and protect people from health risks related to use of unsafe water. |
||||||
| 11 | Max water Supply and Sanitation Services | 5 piped water scheme in three union and one Pourashava in Bogra district | July 2016 to June 2019 | Self-Sustained | BDT 54,839,552 | Max Foundation, Netherlands |
|
Goal / Objective
Improve health and wellbeing of the population through establishing water business model and sanitation services |
||||||
| 12 | Introducing Water-Efficient Technologies to Barind Tract Project (IWET) | Tanore, Nachole, Godagari, Gomstapur, Chapainwabganj Modevpur and Badalgachi of Rajshahi division | January 2018 to August 2024 | Completed | BDT 24,599,015 | Coca-Cola Company through 2030 Water Resource Group of the World Bank |
|
Goal / Objective
Enhancing agro-water productivity, reducing ground-water extraction and increasing farmers' income, focusing on the water-stressed North-West region especially in the Barind Tract. |
||||||
| 13 | Strengthened Civil Society Protects and Promotes Women's Rights (SCSPPWR) | Nachole, Chapai Nawabganj, Porsha and Shapahar Upazila of Chapai Nawabganj and Naogaon district | January 2018 to April 2021 | Completed | BDT 27,919,873 | European Union and NETZ Partnership for Development and Justice |
|
Goal / Objective
Civil society, democracy activists and human rights defenders proactively enhance protection and promotion of human rights and further democratisation in Bangladesh. |
||||||
| 14 | Strengthening of Resilience and Adaptability to Climate Change in North Bangladesh (REAP) | 8 Unions in Atrai and Raninagar Upazila of Naogaon district | 01 January 2019 to 31 December 2021 | Completed | BDT 35,667,804 | German Federal Ministry for Economic Cooperation and Development (BMZ) and NETZ |
|
Goal / Objective
In the district of Naogaon, the project contributes to overcoming extreme poverty (SDG 1) and reducing vulnerability to the adverse consequences of climate change (SDG 13). |
||||||
| 15 | Strengthening the Resilience of the Poorest Population to the Impacts of Climate Change in Bangladesh (PORIBESH) | 12 Unions in Atrai and Raninagar Upazila of Naogaon district | 01 September 2021 to 31 December 2024 | Completed | BDT 62,740,735 | German Federal Ministry for Economic Cooperation and Development (BMZ) and NETZ |
|
Goal / Objective
Marginalised and climate change-affected people in western Bangladesh have built climate-resilient livelihoods, and local civil society is strengthened to protect and promote the rights of marginalised groups. |
||||||
| 16 | Inclusive and Equitable Quality Pre-Primary and Primary Education at Formal Schools in Bangladesh (IQ) | Barind tract in Chapai Nawabganj district | 01 February 2019 to 31 December 2022 | Completed | BDT 26,289,166 | Child Aid Network and NETZ Partnership for Development and Justice |
|
Goal / Objective
Enhance the quality of pre-primary and primary education at formal schools for children from extremely poor and marginalized families in Bangladesh. |
||||||
| 17 | MaMoni Maternal and New Born Care Strengthening Project (MaMoni-MNCSP) | Lakshmipur, Chandpur, Mymensingh and Netrokona district | 01 April 2019 to 31 September 2022 | Completed | BDT 90,873,415 | USAID through Save the Children |
|
Goal / Objective
Increased equitable utilization of quality MNC services from government health centres. |
||||||
| 18 | Promotion of Social Partnership for Empowerment of Marginalised Communities in 6 Districts and at National Level in Bangladesh (PROSPECT) | 12 Unions in Godagari and Tanore Upazila of Rajshahi and Naogaon district | 1 July 2019 to 31 December 2022 | Completed | BDT 41,216,949 | German Federal Ministry for Economic Cooperation and Development (BMZ) and NETZ |
|
Goal / Objective
Human rights defenders and public authorities are strengthened to protect and promote rights of marginalised communities in 2 districts in Bangladesh. |
||||||
| 19 | Access to Inclusive Quality Education for Children from Families Living in Ultra-Poverty and Religious Minorities (ACCESS) | Godagari and Tanore Upazila of Rajshahi district | 15 October 2019 to 31 December 2022 | Completed | BDT 23,784,354 | German Doctors e.V. through NETZ Partnership for Development and Justice |
|
Goal / Objective
Disadvantaged children attain inclusive and quality pre-primary and primary education at existing formal schools. |
||||||
| 20 | Combating Impacts of Climate Change in Severely Affected Areas of Bangladesh (TECSAI) | Nachole and Gomastapur Upazila in Chapai Nawabganj district | 01 October 2020 to 31 December 2024 | Completed | BDT 42,513,060 | German Federal Ministry for Economic Cooperation and Development (BMZ) and NETZ |
|
Goal / Objective
The economic and social resilience of people affected by the consequences of climate change in the Ganges-Brahmaputra Basin increases significantly and their livelihood improves. |
||||||
| 21 | Young People at High Schools Strengthen Women's Rights and Inclusive Governance in Bangladesh (YUKTA) | Sadar and Nachole Upazila of Chapai Nawabganj, Paba and Mohonpur Upazila of Rajshahi, Sadar and Panchbibi Upazila of Joypurhat, Sadar and Lalpur Upazila of Natore district | 01 February 2021 to 31 December 2024 | Completed | BDT 15,187,115 | German Federal Ministry for Economic Cooperation and Development (BMZ) and NETZ |
|
Goal / Objective
Human Rights Defenders (HRDs) at state high schools are strengthened to promote gender equality and inclusive governance in 8 districts and at national level in Bangladesh. |
||||||
| 22 | Resilience to Economic Volatility of Indigenous and Vulnerable Populations through Empowerment (REVIVE) 1 | Nachole and Gomastapur Upazila of Chapai Nawabganj district | 01 July 2021 to 30 June 2023 | Completed | BDT 35,696,234 | HEKS/EPER |
|
Goal / Objective
To contribute to the economic recovery and resilience of indigenous and other marginalized communities in north-western Bangladesh. |
||||||
| 23 | Strengthening the Resilience of the Poorest Population to the Impacts of Climate Change in Bangladesh (PORIBESH) | Atrai and Raninagar Upazila of Naogaon district | 01 September 2021 to 31 December 2024 | Completed | BDT 62,740,735 | NETZ Partnership for Development and Justice |
|
Goal / Objective
Marginalised and climate change-affected people in western Bangladesh have built climate-resilient livelihoods, and local civil society is strengthened to protect and promote the rights of marginalised groups. |
||||||
| 24 | Strengthening Young and Adult Peace Multipliers in Bangladesh (AHIMSA) | Badalgachi and Mohadevpur Upazila of Naogaon district | 01 April 2022 to 31 June 2024 | Completed | BDT 14,640,275 | NETZ Partnership for Development and Justice and zivik (German Federal Foreign Office) |
|
Goal / Objective
A peaceful and inclusive society, where indigenous peoples have a dignified life without experiencing direct, structural and cultural violence based on their identity. |
||||||
| 25 | Resilience to Economic Volatility of Indigenous and Vulnerable Populations through Empowerment (REVIVE) 2 | Manda, Niamatpur and Dhamuirhat Upazila of Naogaon district | 01 June 2022 to 30 June 2023 | Completed | BDT 25,448,225 | HEKS/EPER |
|
Goal / Objective
To contribute to the economic recovery and resilience of indigenous and other marginalized communities in north-western Bangladesh. |
||||||
| 26 | REVIVE Follow Up Project | Nachole and Gomastapur Upazila of Chapai Nawabganj district | 1 July 2023 to 31 December 2023 | Completed | BDT 2,930,719 | HEKS/EPER |
|
Goal / Objective
To contribute to the economic recovery and resilience of indigenous and other marginalized communities in north-western Bangladesh. |
||||||
| 27 | Strengthening Water and Sanitation Integrity (SWSI) | Rajshahi district: Godagari Upazila, with nine Unions and two Paurashavas | 01 January 2024 to 31 December 2024 | Completed | BDT 3,211,453 | Water Integrity Network (WIN) |
|
Goal / Objective
Strengthening water and sanitation integrity for Godagari, Rajshahi, Bangladesh. |
||||||
| 28 | Climate Resilient Agricultural Advancement in Barind (CRAAB) | Poba of Rajshahi, Sadar of Chapainawabgonj, Niamotpur and Patnitola of Naogaon | 1 July 2023 to 31 December 2025 | Completed | BDT 21,733,417 | HSBC |
|
Goal / Objective
Increase productivity, diversify livelihood and reduce GHG emission through promotion of CSRA technologies (precision land levelling, alternate wetting and drying for rice, ultra-high-density production with drip irrigation for mango). |
||||||
| 29 | Promoting Inclusive and Equitable Quality Education in Two Rural Districts of Bangladesh (Priority) | Godagari and Tanore Upazila in Rajshahi District | 1 January 2024 to 31 December 2027 (4 years) | Ongoing | BDT 51,506,262 | NETZ Partnership for Development and Justice |
|
Goal / Objective
Enables 7,500 girls and boys at 30 government primary schools with integrated preschools in remote, rural regions of western Bangladesh to receive inclusive and equitable quality pre-primary and primary education, focused on areas severely affected by natural disasters and the COVID-19 pandemic. |
||||||
| 30 | Pilot Demonstrations of Sustainable Rice Production (SRP) | Niamotpur Upazila | February 2024 to July 2025 (18 months) | Completed | USD 99,638 | Asian Development Bank (ADB) |
|
Goal / Objective
IoT-based irrigation management system installed on AWD and non-AWD farmer paddy fields, measuring carbon emissions via low-cost chambers and enabling efficient water use through IoT-based AWD practices in boro paddy with reduced carbon emissions. |
||||||
| 31 | Water Management Project for Vulnerable Communities in Barind Tract (WMP) | Naogaon District: 8 Unions of Niamotpur Upazila | 01 July 2023 to 30 June 2026 (3 years) | Completed | BDT 74,851,743 | The Coca-Cola Foundation |
|
Goal / Objective
Builds community institutions and improves water management in the Barind Tract through pond and canal re-excavation, check dams, drinking water supply, hygiene promotion, water-efficient technology, rainwater harvesting and managed aquifer recharge, targeted via the government's Pro-Poor Strategy. |
||||||
| 32 | Community-Led Climate Smart Innovation to Address Climate Change Impacts (UDDOM) | Islampur Upazila in Jamalpur District | 27 May 2024 to 26 May 2026 | Closed | BDT 18,225,792 | USAID through BRAC |
|
Goal / Objective
Supports communities to reduce the risk of climate-related disasters and improve communities' resilience to climate change. |
||||||
| 33 | Thriving through Equity, Economic Empowerment and Climate Resilience (THRIVE) | Dhamoirhat, Mohadebpur, Patnitala, Niamotpur, Porsha, Sapahar, Manda, Gomostapur, Nachole | January 2024 to 31 December 2028 (5 years) | Ongoing | BDT 33,861,100 | HEKS/EPER |
|
Goal / Objective
Creates an enabling environment for improved and resilient life for Dalits, Adivasis and other marginalised groups in Naogaon and Chapainawabganj districts, ensuring access to rights and socio-political, cultural and economic wellbeing. |
||||||
| 34 | Improving Young People's Access to SRHR through a Community-Based Approach and Cooperation with State Institutions (A-EMPOWER) | 25 Upazilas in Rajshahi, Chapainawabganj and Naogaon | 01 July 2024 to 31 December 2028 (4.5 years) | Ongoing | BDT 116,196,713 | German Doctors |
|
Goal / Objective
Aligned with the National Youth Health Strategy 2017-2030, aims for 62,861 young people aged 10-19 (including 31,423 girls) in Naogaon, Chapainawabganj and Rajshahi to increasingly use customised sexual and reproductive health and rights services. |
||||||
| 35 | Strengthening the Economic, Social and Political Participation of Multiply Marginalised Women in Climate Hotspots of Bangladesh and India (AGROJATRA) | Nachole, Gomostapur of Chapainawabganj district and Atrai, Raninagar of Naogaon district | 15 January 2025 to 31 December 2028 | Ongoing | BDT 65,406,550 | NETZ Partnership for Development and Justice |
|
Goal / Objective
Marginalised women and their families affected by climate change in northern Bangladesh and West Bengal (India) improve economic, social and political participation and protect the rights of marginalised groups. |
||||||
| 36 | Environmental Human Rights for a Just Transition: Strengthened Local CSOs Transforming Climate Hotspots into Resilient Communities (ENGAGE) | Rajshahi District: Tanore and Godagari Upazila; Naogaon District: Manda and Mohadevpur Upazila | 01 January 2025 to 31 December 2028 (4 years) | Ongoing | BDT 61,242,520 | NETZ Partnership for Development and Justice |
|
Goal / Objective
Enhances CSOs to independently contribute to sustainable development, human rights, democracy and good governance, with local CSOs led by women, youth and indigenous peoples protecting the right to a healthy, climate-resilient environment. |
||||||
| 37 | Strengthening Climate-Vulnerable Urban Communities for Resilience and Gender-Inclusive Sustainable Development (Re-Gen) | 3 slums of Rajshahi District | January 2025 to December 2027 (3 years) | Ongoing | BDT 30,688,000 | Climate Bridge Fund (CBF) |
|
Goal / Objective
Enhances resilience of climate-affected urban communities via integrated livelihood, health, WASH, gender-based-violence and community-resilience interventions, with focus on maternal, newborn and child health and gender-inclusive infrastructure. |
||||||
| 38 | Gender Equality Transforms Climate Action (GETCA) | Tanore, Godagari, Charghat Upazila | 18 December 2024 to 17 June 2027 | Ongoing | BDT 9,045,618 | Swiss Development and Cooperation (SDC) and Global Affairs Canada (GAC) |
|
Goal / Objective
Increases the voice, representation and participation of civil society - especially women, youth and marginalised groups - to influence government decision-making, ensure accountability and act on rights violations. |
||||||
| 39 | Civil Society Leadership in Mobilising for Better WASH (CLIMB) | Niamatpur, Naogaon | April 2026 to November 2028 | Ongoing | BDT 23,038,838 | Swedish International Development Cooperation Agency (SIDA), led by WaterAid |
|
Goal / Objective
Strengthens civil society and local government institutions to sustain inclusive, climate-resilient WASH governance for long-term resilience in water-stressed Barind communities. |
||||||
| 40 | Meeting Targets and Maintaining Epidemic Control (EpiC) | Naogaon, Natore | 1 February 2026 to 30 September 2026 | Ongoing | BDT 41,315,597 | US Government |
|
Goal / Objective
Global health security through a One Health approach. |
||||||
| 41 | Women and Youth Led Socio-Economic Transformation for Resilient and Just Communities | Porsha, Naogaon | January 2026 to December 2028 | Ongoing | BDT 21,585,000 | ActionAid Bangladesh |
|
Goal / Objective
Promotes an inclusive, equitable and sustainable society by enhancing the social and economic resilience of 1,000 households in Chhaor and Nitpur Union under Porsha Upazila. |
||||||
| 42 | Accelerating Action to End Child Marriage (SHOMBHABONA) | Chapainawabganj | May 2026 to October 2026 | Ongoing | BDT 1,870,961 | ActionAid Bangladesh, under a UNFPA workplan on gender-based violence and harmful practices prevention |
|
Goal / Objective
Accelerates the elimination of child marriage in Bangladesh by transforming the social, cultural and institutional systems that perpetuate the practice, while empowering adolescent girls to exercise their rights, agency and informed choices. |
||||||
No projects match your search.
Figures as recorded in DASCOH Foundation's internal project register. Budgets shown in the currency originally reported; taka figures are not converted to a common currency.
A short stories of our 28 years organization journey
February 1998 to March 2004
Name of Upazila/district
35 unions in 10 Upazillas in Rajshahi and Chapai Nawabgonj districts.
Funding Agencies
Swiss Agency for Development and Cooperation (SDC).
April 2003 to December 2012
Name of Upazila/district
6 unions in Paba, Mohonpur and Bagmara Upazila in Rajshahi and 11 Unions in Shibganj and Chainawabganj Sadar
Funding Agencies
Swiss Agency for Development and Cooperation (SDC)
January 2013 to December 2015
January 2009 to December 2012
Name of Upazila/district
9 Unions and 2 Paurashavas of Godagari Upazila, Rajshahi District.
Funding Agencies
Swiss Red Cross (SRC)
January 2013 to September 2019
Name of Upazila/district
233 Community Clinics in 71 Ups in 9 Upazila of Rajshahi district in Phase I and 262 Community Clinics, 22 Family Welfare Centre and 5 Upazila health complex in Phase II
Funding Agencies
Swiss Red Cross (SRC)
October 2019 to September 2022
Name of Upazila/district
110 Community Clinic, 42 Family Welfare Centre and Union Sub Centre, 5 Upazila Health Complex
Funding Agencies
Swiss Red Cross (SRC)
January 2013 to June 2019
September 2014 to June 2018
Name of Upazila/district
35 Unions and 4 Pourashavas in 6 Upazila of Rajshahi and Chapai Nawabganj districtst
Funding Agencies
consortium in collaboration with ministry of water resources financed by SDC
01 July 2018 to 31 December 2023
Name of Upazila/district
39 Unions and 3 Pourashava in 8 Upazila of Rajshahi, Chapai Nawabganj and Naogaon districts
Funding Agencies
Jointly implemented by DASCOH-SRC consortium in collaboration with ministry of water resources financed by SDC
July 2016 to June 2019
Name of Upazila/district
5 piped water scheme in three union and one Pourashava in Bogra district
Funding Agencies
Max Foundation, Netherlands
January 2018 to August 2022
Name of Upazila/district
Tanore,Nachole, Godagari, Gomstapur, Chapainwabganj Modevpur and Badalgachi of Rajshahi division
Funding Agencies
Coca-Cola Company through 2030 water Resource Group of the World Bank
January 2018 to April 2021
Name of Upazila/district
Nachole, Chapai Nawabganj, Porsha and Shapahar Upazila of Chapai Nawabganj and Naogaon district
Funding Agencies
European Union and NETZ Partnership for Development and Justice
01 January 2019 to 31 December 2021
01 September 2021 to 31 December 2024
01February 2019 to 31 December 2022
01 April 2019 to 31 September 2022
Name of Upazila/district
Lakshmipur, Chandpur, Mymensingh and Netrokona district
Funding Agencies
USAID through Save the Children
1 July 2019 to 31 December 2022.
15 October 2019 to 31 December 2022
01 October 2020 to 31 December 2023
01 February 2021 to 30 June 2024
01 July 2021 to 30 June 2023
01 September 2021 to 31 December 2024
01 April 2022 to 31 June 2024
Name of Upazila/district
Badalgachi and Mohadevpur Upazila of Naogaon district
Funding Agencies
NETZ Partnership for Development and Justice and zivik (German Federal Foreign Office).
1 July 2023 to 31 December 2025
Name of Upazila/district
Poba of Rajshahi, Sadar of Chapainawabgonj, Niamotpur and Patnitola of Naogaon
Funding Agencies
HSBC
1 July to 31 December 2023
Name of project
REVIVE Follow Up Project
Name of Upazila/district
Nachole and Gomastapur Upazila of Chapai Nawabganj district Manda, Niamatpur and Dhamuirhat Upazila of Naogaon district
Funding Agencies
HEKS/EPER
December 1, 2023, and Feb 2024.
Name of Upazila/district
Chagalnaiya, Fulgazi, Sonagazi, Feni sadar and Mirshahrai
Funding Agencies
Asian Development Bank (ADB)
Feb 2024 to July 2025 (18 Month)
Name of project
Pilot Demonstrations of Sustainable Rice production (SRP)
Name of Upazila/district
Godagari Upazila
Funding Agencies
Asian Development Bank (ADB)
4 Years (1st January, 2024 – 31 December, 2027)
Name of Upazila/district
Godagari and Tanore Upazila in Rajshahi District
Funding Agencies
NETZ Partnership for Development and Justice